Turner Valley Gas Plant Provincial Historic Site

Studies and Test Results

All environmental studies and reports produced will be posted to this website as soon as they are available.

  • Shallow Soils Remediation, 2014
  • Shallow Soils Assessments, 2013
  • Natural Gas Seepage near Dingman No. 1 2010 Investigation
  • Natural Gas Seepage near Dingman No. 1 2009 Investigation
  • 2009 Groundwater Monitoring Report
  • 2008 Groundwater Monitoring Report
  • 2007 Hydraulic Monitoring Report
  • Report of the Turner Valley Gas Plant Resolution Advisory Panel to the Minister, 2007
  • 2006 Drilling Investigation and Water Monitoring Report
  • Removal of Underground Storage Tanks, Remediation of Mercury Contamination, 2005
  • Surface Water and Ground Water Monitoring Programs Interim Report, 2005
  • Surface Water and Ground Water Monitoring Programs, 2005
  • Construction Summary Report - Sulphur Remediation, 2005
  • Naturally Occurring Radioactive Material (NORMS) Report
  • Surface Water and Groundwater Monitoring Programs Interim Report Fall 2004
  • Tour Path Mercury Investigation, 2003
  • Surface Water and Groundwater Monitoring Programs, 2003
  • Surface Water and Ground Water Monitoring Programs Fall 2003 Interim report, 2004
  • Mercury Vapour Monitoring, 2002
  • Winter Groundwater Monitoring, 2002
  • Surface Water and Groundwater Monitoring Programs, 2001
  • Risk Management Options Turner Valley Gas Plant, 1999
  • Environmental Risk Assessment Turner Valley Gas Plant, 1999
  • Turner Valley Gas Plant Underground Storage Tanks, 1997
  • Remediation Options for Mercury-Contaminated Soil, 1996
  • Hell's Half Acre Subsurface Assessment Program Vol. 1, 1996
  • Hell's Half Acre Subsurface Assessment Program Vol. 2, 1996
  • Asbestos Investigation and Recommendations, 1995
  • Investigation of Soil Mercury Distribution, 1995
  • Results of Sheep River Sampling, 1995
  • Fluid Seepage, 1994
  • State of Contamination and Public Hazard, 1991
  • Review of Initial Contamination Assessments, 1991
  • Preliminary Environmental Audit, 1991
  • Western Decalta Turner Valley Gas Plant Site Characterization Report, 1987-88

  •  

     

     

    Last reviewed/revised: March 18, 2016